इसे छोड़कर सामग्री पर बढ़ने के लिए

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

With 180° Rotation

बिक गया
मूल कीमत ₹ 32,947.00 - मूल कीमत ₹ 32,947.00
मूल कीमत
₹ 32,947.00
₹ 32,947.00 - ₹ 32,947.00
मौजूदा कीमत ₹ 32,947.00
SKU : B-FLCM-FLN-01

Flycam Flowline Starter for Camera & Gimbals

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Note: It is recommended to attach the minimum required weight (3kg / 6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

02.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb / 16lb).
The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

SPECIFICATIONS

Payload Capacity 

Min - Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Support Arm Rotation

  180°

Flowline Weight

  Complete 3.6kg / 8lb

Height 

  Mounted: 100cm | 39.4inch
  Folded: 64cm

Suspension Line

  Material: 3mm Nylon
  Length (Rope): 152.5cm | 60inch When fully stretched

Top Bar 

  Length: 480mm
  Rotation: 180°

Waist hip strap length

  Min-Max: 81cm - 125cm (32 inch - 49 inch)

Dimensions

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

Product Weight (Without Packing)

  3.8kg / 8.3lb

Product Volumetric Weight (With Packing)

  11.5kg / 25.4lb

IN THE BOX

Flycam Basic Flowline with 180° Rotation
Bag

USER MANUAL


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 7 days

warranty

1-Year Warranty
On All Products